Another picture of the pipes.
Date: 07/26/04
Views: 9020
|
A picture of the pipes on the ground.
Date: 07/26/04
Views: 7386
|
The tractor that is being used, to dig the ground to place the pipes in.
Date: 07/26/04
Views: 9256
|
Picture of the front of the building. There will also be wheel chair accessibility on the KiHS side.
Date: 07/26/04
Views: 7025
|
The two tanks, that will hold the fuel for heating, in the winter. Let's hope that there is no fuel oil spills...
Date: 07/26/04
Views: 7305
|
A picture taken of the back of the
new building for KiHS, and the
E-Centre.
Date: 07/26/04
Views: 7259
|
This side is the E-Centre side, where all the computers will be placed.
Date: 07/26/04
Views: 7264
|
Furnace room, on E-Centre side.
Date: 07/26/04
Views: 7168
|
The furnace room, on KiHS side.
Date: 07/26/04
Views: 7599
|