|
Another picture of the pipes.
Date: 07/26/04
Views: 15202
|
A picture of the pipes on the ground.
Date: 07/26/04
Views: 12519
|
The tractor that is being used, to dig the ground to place the pipes in.
Date: 07/26/04
Views: 14817
|
|
Picture of the front of the building. There will also be wheel chair accessibility on the KiHS side.
Date: 07/26/04
Views: 12548
|
The two tanks, that will hold the fuel for heating, in the winter. Let's hope that there is no fuel oil spills...
Date: 07/26/04
Views: 12827
|
A picture taken of the back of the
new building for KiHS, and the
E-Centre.
Date: 07/26/04
Views: 11775
|
|
This side is the E-Centre side, where all the computers will be placed.
Date: 07/26/04
Views: 12026
|
Furnace room, on E-Centre side.
Date: 07/26/04
Views: 12724
|
The furnace room, on KiHS side.
Date: 07/26/04
Views: 12692
|